- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
重庆尚兵律师分析解读重庆律师法律服务市场及收费标准
重庆律师—刘尚兵律师
( HYPERLINK /lawyers/index-169858.html /lawyers/index-169858.html)
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by
您可能关注的文档
- 酒店务质量检查常见案例.doc
- 酒店力资源管理手册P.doc
- 酒店厅培训计划.doc
- 酒店务质量评审细则jiahe.doc
- 酒店务管理制度.doc
- 酒店厅服务管理案例.doc
- 酒店厅管理全集星级酒店VIP接待策划书.doc
- 酒店员工入店培训.doc
- 酒店全工作管理规定.doc
- 酒店品生产管理系统.doc
- 论社区矫正与刑罚制度改革.pdf
- 大桥菱形挂篮施工工艺细则.pdf
- 越南的经济变革与出口业绩.pdf
- 有关于社区年度工作计划.pdf
- 【华宝财富俱乐部】国土绿色行沙漠邀请赛面向全国赞助招商.pdf
- 公司股权融资计划书ppt.pptx
- 中国血液透析用血管通路专家共识(第2版)解读.ppt
- 内容文稿教程108 jco.pdf
- 此旨在仅以外使用其内容可能与美国版不同这不会被转售wooldridge ie aise ssm.pdf
- community exterior space and commercial inctive fusion phenomenon analysis社区外部空间商业不可融合现象分析.pdf
最近下载
- 电子课件-《汽车维护与故障排除(第三版)》-A07-0365单元1 离合器的维护与故障诊断排除.pptx VIP
- 酒店保洁服务整体投标方案(技术方案).doc
- 精品解析:山东省潍坊市2023-2024学年高一下学期7月期末考试物理试题(解析版).docx VIP
- 职业性减压病的诊断.ppt VIP
- 应征入伍服兵役高等学校学生国家教育资助申请表1(样表).docx
- 部编版七年级语文上册狼.pptx VIP
- 2025年培训知识红十字会应急救护知识ppt课件.pptx VIP
- T/CEEMA 020-2020 燃气蒸汽联合循环发电机组对标管理办法.pdf VIP
- (完整版)电子倒计时定时器设计毕业设计论文.pdf VIP
- 高三语文作文指导议论文如何论证课件(共23张PPT).pdf VIP
文档评论(0)