- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
钢结施工质量保证体系
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 金地团西安公司新员工入职培训管理制度.doc
- 金华业检网上申报流程工商检取消改为报制度.doc
- 金华民营经济转型升级的机制和路径研究.doc
- 金基车广告策划方案.doc.doc
- 金属料冲压加工中的摩擦与润滑研究.doc
- 金属构设备制造监理实施细则.doc
- 金工习教学大纲机.doc
- 金昌动公司员工培训的研究.doc
- 金地团扩张与领先的奥秘―金地集团集团管控研究.doc
- 重庆青藤物业管理有限公司员工制度.doc
- 2023年度施工员过关检测试卷【考点梳理】附答案详解.docx
- 2023年度施工员过关检测试卷.docx
- 2023年度施工员试题预测试卷及答案详解(考点梳理).docx
- 2023年度施工员试题(易错题)附答案详解.docx
- 2023年度施工员试题预测试卷及答案详解参考.docx
- 2023年度施工员试题预测试卷及参考答案详解(精练).docx
- 2023年度施工员试题预测试卷及完整答案详解(全优).docx
- 2023年度施工员试题预测试卷(达标题)附答案详解.docx
- 2023年度施工员试题预测试卷及参考答案详解(培优A卷).docx
- 2023年度施工员试题预测试卷及参考答案详解(轻巧夺冠).docx
文档评论(0)