- 1、本文档共49页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
铁道铁路林业技术管理规则
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 金融清华大学出版社.doc
- 金融程习题及答案.doc
- 金融网上作业案例分析题.docx
- 金融计信息化及其在国家治理中的作用.doc
- 金融考试复习卷.doc
- 金融系的功能.doc
- 金融究分析KPO服务产业的主要特征与业务模式分析.doc
- 金融生工具自己归纳的.doc
- 金融案例评析.doc
- 金融计课件整理.doc
- 2025年冷链物流温控技术在冷链物流冷链食品冷链物流信息化建设中的应用报告.docx
- 金融科技在金融行业中的客户关系管理与营销策略报告.docx
- 特色小镇产业升级路径规划与2025年社会稳定风险评估报告.docx
- 2025年老年健康管理长期照护服务模式老年人健康管理服务模式慢性病管理体系.docx
- 模具制造数字化设计与仿真技术在模具制造智能化中的应用报告.docx
- 私域流量运营在零售行业中的数据分析与效果评估报告2025年.docx
- 2024-2025学年初中物理八年级上册沪教版教学设计合集.docx
- 2025年储能设备生命周期环境影响评估手册.docx
- 全球酒店预订平台技术创新与产业变革报告.docx
- 环保产业园2025年循环经济模式下的环境监测技术发展报告.docx
文档评论(0)