- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
长治商局营业执照检网上申报流程最新版
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 银行位竞聘演讲稿合集.doc
- 银行内部控制体系的探究.doc
- 银行从业资格认证考试《风险管理》一.doc
- 银行园招聘简答题.doc
- 银行函业务的法律风险及其防范.doc
- 银行从业资格考试公司信贷章考点.doc
- 银行员综合技能提升训练.doc
- 银行品创新研究.doc
- 银行招聘行测言语理解技巧二.doc
- 银行园招聘考试单项简答题.docx
- 四级真题高频词列表版.pdf
- 解压后造星美丽而又危险峡谷.pdf
- 成果harcourt gk幼儿园级05 the city.pdf
- 期末综合素养检测卷(卷三)-五年级数学下册典型例题(苏教版)_1.docx
- 专题11口语交际-五年级语文上册期末复习知识点(部编版).docx
- xilinx virtex-5 xupv5 lx110t fpga开发板原厂光盘版13a lab2 intro.pdf
- 飞思k64 frdm开发板软件avarice.pdf
- 假期安全素材电话号.pdf
- yangwenyu专业retail-chief project officer零售监项目官.pdf
- 文本主题1topic 1 lecture 3讲座.pdf
文档评论(0)