- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高层筑施工测量施工技术
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
最近下载
- (2025秋新版)人教版二年级数学上册全册教案.pdf
- 饲料原料验收标准 .pdf VIP
- 荣威550电路图手册.pdf VIP
- 新解读《GB_T 20833.4 - 2021旋转电机 绕组绝缘 第4部分:绝缘电阻和极化指数测量》最新解读.pptx VIP
- Triumph凯旋摩托 Classic 系列 Bonneville T100 2021车主手册说明书(中文).pdf VIP
- 数控铣工图纸(60份).doc VIP
- 食材配送投标方案(技术标421页).docx VIP
- 某大型集团企业财务共享业财一体化数据平台建设方案(34页PPT).pptx VIP
- NY-T 1276-2007 农药安全使用规范 总则.pdf VIP
- MBA管综199万能工具_数学公式大全.pdf VIP
文档评论(0)