- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
高层筑施工测量施工方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 餐饮理公司楼面运营操作手册.doc
- 餐饮面管理疑难杂症全攻略.doc
- 餐饮训资料.doc.doc
- 餐饮业网络宣传与销售方案.doc
- 餐饮长管理入门.doc
- 餐饮术部工作规程.doc
- 饭店业的成长.doc
- 餐饮训讲义集邹金宏.doc
- 饭店理复习材料.doc
- 饭店导管理教学大纲.doc
- 多点监督与特征融合校准:目标检测算法的创新与突破.docx
- 南宁市门诊HIV_AIDS患者抑郁状况剖析与影响因素探究.docx
- 医疗过失犯罪中客观归责理论的精准适用与深度解析.docx
- 南宁市低碳经济发展研究.docx
- 清解瘀毒胶囊对脑出血大鼠血红蛋白毒性作用及机制探究.docx
- 内蒙古赤峰市元宝山区农村小学教师培训:现状、问题与突破路径.docx
- 泉州开发区国有资产投资经营有限公司发展战略研究:基于区域经济与市场环境的分析.docx
- 能源利用效率与经济增长方式的深度耦合及中国战略抉择.docx
- 分布式信号波达方向 - 时延联合估计算法的深度剖析与创新探索.docx
- 新媒体环境下大学校园精神传播的创新变革.docx
文档评论(0)