PAGE  PAGE 162 内容摘要 本设计为铭晟综合住宅小区项目工程,位于温江区温江新城中心城区涌泉街道办事处新华村1组燎原5组地界内,该工程有主副两栋大楼,总工期为18个月。该设计分为初步设计和详细设计两个步骤。初步设计按照施工组织设计基本内容,对工程安装部署进度施工方案进行简略编制. 详细设计以具体施工组织设计内容-土建、水、电、消防系统安装、措施内容等,进行编制. 关键词 施工组织设计;住宅小区;进度;文明;措施;部署;职责; D=*3Xd Abstract VNKtJmt ? This design Sheng-ming, an integrated residential quarters for the Project is located in downtown wenjiang district Wen River Park, Fountain Street office, Xinhua Village, a group within the boundary of a prairie fire five groups, which works all major two buildings, a total duration of 18 months. The design is divided into the prelimin