- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
『润联网』
登录【润联网】查询价格
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- +BC电子商务物流配送模式分析以苏宁易购带为例.doc
- +义务教育实施细则.doc
- ,不合格账户或成批提前中止交易.doc
- ,应化标准团支部申请材料.doc
- A 决胜终端 提升业绩2.doc
- Acrel用户变电站综合自动化系统.doc
- Acrel电力监控系统在青岛橡胶谷的应用方小燕.doc
- AEG UPS电池的储存安装和维护.doc
- APB税控器网报流程操作流程.doc
- App 暖通专业风管水管材料一览表.doc
- 专卖店促销员销售与成交技巧培训课件(34P).pptx
- 红色商务风新员工入职销售技巧知识培训课件(34P).pptx
- 专卖店商场销售员销售与成交技巧培训课件(34P).pptx
- 小区物业保安法律知识培训课件(28P).pptx
- 专卖店销售员轻松成交技巧培训(34P).pptx
- 轻松成交客户新员工入职通用销售技巧知识培训(34P).pptx
- 2024年初级《银行业法律法规与综合能力》考前必刷必练题库500题(含真题、必会题).docx
- 2024年“新安法知多少”知识竞赛题库及答案(最新版).docx
- 2024年30秒毕业生面试工作自我介绍.docx
- 2024年《医务人员礼仪培训》心得体会.docx
最近下载
- 2023年上海市中考英语试卷及答案.docx
- Zippo-2022原版年册(哈雷戴森系列).doc VIP
- 文言文阅读教学设计 王荣生.pdf VIP
- 请分析“两弹一星”精神的内涵是什么?作为新时代中国特色社会主义的年轻人,如何继承和弘扬这种精神?试述辛亥革命的意义和局限是什么?.docx
- 大宗商品电子交易市场电子商务平台解决方案.pdf
- 黑布林阅读初二13《鲁滨逊漂流记》中文版.pdf
- Zippo哈雷戴森系列年册1996-2021年全册合并(共26册).docx VIP
- 幼儿早教中动手科学实验的引导.pptx VIP
- 口腔护理个案优秀案例ppt.pptx
- BEPS行动计划简介及中国落地实践(吴建民).pptx
文档评论(0)