- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
new中国航信GDS全球分销协议单体
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- a文化宜化 宜化文化赵小红.docx
- A族创新营销案例:激活万中产消费客户.doc
- A第一单元 综合提升训练 学生稿.doc
- bad防爆灯和防爆马路灯价格.docx
- baidu 自动售货机毕业设计.doc
- BB电子商务信用评价模式研究.doc
- BK活性炭,河南郑州活性炭厂.doc
- BHXWF型无负压供水设备功能说明.doc
- BS系统的用户权限设计与实现pdf.doc
- BC电子商务平台网络推广方案.doc
- 2024年淮北职业技术学院高职单招(政治)历年考点笔试题库含答案解析.doc
- 山东省济南市外国语学校三箭分校2019-2020学年高一下学期3月月考语文试卷.docx
- 2021-2022学年上海市吴淞中学高一(下)期末化学试卷.docx
- 2022-2023学年上海市奉贤区致远高级中学高二(下)期中政治试卷(等级考).docx
- 2022-2023学年上海浦东新区新川中学高二(下)期中英语试卷.docx
- 2022-2023学年上海市奉贤区致远高级中学高一(下)期末历史试卷.docx
- 2024年庄河市中心医院专项招聘医学类人员及高层次卫技人才历年笔试常考点试题含答案带黑钻版详解.docx
- 初中语文工作总结【独家总结范文】.doc
- 2018年行政主管年终工作总结范文【独家总结范文】.doc
- 2024年湖北生态工程职业技术学院高职单招(政治)历年考点笔试题库含答案解析.doc
文档评论(0)