- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
【】二十五 回眸过往往事并非如烟:中国物流之发展篇
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- vled防爆灯和吸顶防爆灯价格.docx
- QM多媒体教室网络中控方案V.doc
- U标准成本实施方案模版.doc
- ULC有关用在电器上的塑胶材料的要求.doc
- v防爆电机和yb防爆电机价格.docx
- V保险行业资讯第八十期.doc
- wled防爆灯和bay防爆防腐全塑荧光灯价格.docx
- URP高校网络教学系统V.doc
- win解码器和高压防爆接线箱价格.docx
- WINAPI串口通信编程实例教程.doc
- 2025年中国电力电缆行业市场全景评估及投资前景展望报告.docx
- 2025年中国家用称行业市场全景评估及发展战略规划报告.docx
- 2025年中国引风机行业市场调查研究及发展战略研究报告.docx
- 中国食品搅拌机行业市场调研分析及投资战略咨询报告.docx
- 2025年中国广告牌行业发展运行现状及发展趋势预测报告.docx
- 中国航空电源车行业发展前景预测及投资战略研究报告.docx
- 2020-2025年中国激光设备制造行业发展前景预测及投资战略研究报告.docx
- 中国智慧停车行业全景评估及投资前景预测报告.docx
- 中国手持红外测温仪行业发展监测及投资战略研究报告.docx
- 中国智能云机器人行业市场前景预测及投资方向研究报告.docx
文档评论(0)