- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 24
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 五星级酒店商业计划书 酒店行业商业计划书【完整】.doc
- 云大科技亏损及措施.doc
- 二轮学案 中国区域农业可持续发展.doc
- 五种常见的电子商务模式对比.doc
- 五粮液茅台剑南春五粮春五粮醇的辩假妙招! L M z& y+ K Z T.doc
- 五级品德与社会复习卷.doc
- 五资产损失类.doc
- 五四评优先进事迹材料范文.docx
- 五级心理健康《男生女生》教案.doc
- 五邑大学届电子商务人才培养方案.doc
- 人教版数学六年级上册 第一单元 第5课时 分数乘小数.pptx
- 人教版数学六年级上册 第四单元 第3课时 比的应用.pptx
- 人教版数学六年级上册 第五单元 第5课时 圆的面积-2.pptx
- 人教版数学六年级上册 第一单元 第7课时 解决问题-1.pptx
- 人教版数学六年级下册 第二单元 第4课时 利率.pptx
- 人教版数学六年级上册 第一单元 第8课时 解决问题-2.pptx
- 人教版数学六年级下册 第五单元 第2课时 鸽巢问题的一般形式.pptx
- 人教版数学六年级下册 第四单元 整理和复习.pptx
- 人教版数学六年级上册 第一单元 第3课时 分数乘分数-1.pptx
- 人教版数学六年级下册 第六单元复习第2课时 可能性.pptx
文档评论(0)