- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
十五例余字新贺词
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 26
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 出发梦之队 暑期社会实践活动.doc
- 几套音画边框代码.doc
- 出口产品运输包装标准最终版.docx
- 出口退税网上申报客户端用户操作手册外贸网上申报.doc
- 凤姐都羡慕的招瘦身方法.docx
- 出口食品卫生注册登记全套.doc
- 出口货运代理的操作实务和法律风险提示doc.doc
- 凯纳装饰常州位业主超级喜欢认可的装修标准间.doc
- 出口退税的实操图解.doc
- 出租车触屏多媒体信息发布系统项目建设提案.doc
- 2024-2030年中国乒乓球牢度测试机项目可行性研究报告.docx
- 2024-2030年中国乙(丁)基三苯基溴化膦项目投资风险分析报告.docx
- 2024-2030年中国临空经济行业投融资与招商策略分析报告.docx
- 2024-2030年中国中央商务区建设产业发展现状投资规划研究报告版.docx
- 2024-2030年中国中心传动球磨机商业计划书.docx
- 2024-2030年中国中水回用市场竞争格局及前景趋势预测报告.docx
- 2024-2030年中国中圧绝热板资金申请报告.docx
- 2024-2030年中国乙烯醋酸乙烯共聚物EVA产业发展现状及投资可行性研究报告.docx
- 2024-2030年中国CNC数控加工中心项目可行性研究报告.docx
- 2024-2030年中国el冷光片行业运行状况与前景趋势分析报告.docx
文档评论(0)