- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
最新教师节演讲稿范文篇
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 方流芳 合同法.doc
- 旅游保险有关介绍.doc
- 旅游开发中的环境保护导学案.doc
- 旅游同业答谢联谊会串词.doc
- 旅游资源开发复习大纲学生用.doc
- 无公害畜产品产地认定与产品认证申请书新版.doc
- 方案篇蒙氏教具M.doc
- 旅行登山鞋的秘密如何选择户外鞋.docx
- 无线电台站的呼号指配审批办事指南.doc
- 无缝管【无缝管厂家】.docx
- 福建省邵武市四中学片区达标名校2024届中考化学最后一模试卷含解析.doc
- 山东省临沂市沂南县重点达标名校2024届中考适应性考试化学试题含解析.doc
- 2024届浙江省嘉兴地区达标名校中考猜题化学试卷含解析.doc
- 2024届山东省菏泽市单县市级名校中考化学最后一模试卷含解析.doc
- 上海市建平西校2024届中考适应性考试化学试题含解析.doc
- 江苏省南京市六校联考2024年中考联考化学试卷含解析.doc
- 江苏省扬州市江都区城区重点名校2024届中考考前最后一卷化学试卷含解析.doc
- 郑州二中学2024届中考化学五模试卷含解析.doc
- 2024届湖南省张家界市永定区重点中学中考化学最后冲刺模拟试卷含解析.doc
- 河北省石家庄市43中学2024年中考化学模拟试题含解析.doc
文档评论(0)