- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
校园招聘宣传片《学天就是梦想》策划文案
学天教育集团—学天视频部
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts ma
您可能关注的文档
- 期货PTA简介 基础知识 交易入门.doc
- 期末复习资料演讲与口才.doc
- 未成人自救自护知识讲座.doc
- 月份超市促销方案.doc
- 未成人思想道德1.doc
- 未来十国家重点发展行业.doc
- 未成人龄与法律事务分析.doc
- 未成犯思想教育应突出以道德教育为主线.doc
- 末前的合同不适用《劳动合同法》.doc
- 本科专业学论文指导书.doc
- 2022-2027年中国户外广告行业市场运行态势及投资战略研究报告.docx
- 天津市静海区第六中学2024-2025学年高二上学期12月月考思想政治试题(含答案).pdf
- 特殊群体教育市场运行态势及行业发展前景预测报告.docx
- 车身广告行业市场发展监测及投资战略规划报告.docx
- 协议书 合同封面格式 .docx
- 天津市静海区第六中学2024-2025学年高二上学期12月月考英语试题(含答案,无听力原文及音频).pdf
- 游戏动漫教育培训机构行业全景评估及投资规划建议报告.docx
- 2023-2028年中国成都市婚庆行业市场调查研究及发展战略规划报告.docx
- 热点03 第29届联合国气候变化大会在阿塞拜疆首都巴库举行(解析版)-2025年中考地理时事热点深入解读.docx
- 协警合同范本.docx
文档评论(0)