- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
消除负压的几种方法改
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 12
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 注会审计个人总结.doc
- 洲泉卫生院全宗介绍.doc
- 洪晓敏江西农信社的发展现状及其对策研究宋慧琳.doc
- 流行病学简化笔记下.doc
- 洁净煤的开发与利用.doc
- 浅析G时代新媒体的发展及其影响.doc
- 浅析我国固定资产弃置义务的确认与计量.doc
- 流通概论网上作业.doc
- 浅议接地故障电气火灾防护.doc
- 浅析磁器口古镇旅游开发对环境的影响及其发展定稿.doc
- 基于金属元素锌和过渡金属铱与含氮杂环羧酸配体23吡啶基1h吡唑苯羧酸构筑配合物的发光性质的研究.docx
- 基于ssm框架的电子产品销售系统的设计与实现.docx
- 基于web技术的新闻发布系统的设计和实现.docx
- 基于潜在因子和协同过滤的音乐推荐系统的设计与实现.docx
- 我国服务营销的研究现状及趋势基于citespace可视化分析.docx
- 高考历史天天复习与选练题(含解析):第9.3周.doc
- 高考历史天天复习与选练题(含解析):第9.2周.doc
- 高考英语(全国)复习练习题:第52练 word版含答案.doc
- 高考人教版新课标历史复习配套练习:第39讲 经济大危机与罗斯福新政 含解析.doc
- 高考英语(全国)复习练习题:第19练 word版含答案.doc
文档评论(0)