- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 湖北八峰药化T纯化水设备DQ确认.doc
- 湖北襄阳鄂酒文化博览会.doc
- 深圳紫光积阳森林防火指挥中心方案.doc
- 湖北酒店宽带VPN路由器酒店VPN组网方案.doc
- 湖南中粮可口可乐劳动合同书.doc
- 湖南城市学院毕业设计论文材料格式1.doc
- 湖南省自然科学省市联合基金.doc
- 湖北新油菜籽上市可能会出现抢购现象.doc
- 湖南科技大学毕业论文设计封面.doc
- 湖南城市学院毕业设计论文材料格式.doc
- 2024年USB电话商务管理系统项目可行性研究报告.docx
- [白城]2024年吉林白城市通榆县事业单位面向下半年应征入伍高校毕业生招聘笔试历年参考题库(频考点试.docx
- [甘肃]2024年甘肃省地质矿产勘查开发局第一地质矿产勘查院招聘52人笔试历年参考题库(频考点试卷).docx
- 2024年端子机刀片刀模项目可行性研究报告.docx
- 2024年情侣相框项目可行性研究报告.docx
- [玉溪]2024下半年云南玉溪市事业单位招聘工作人员189人笔试历年参考题库(频考点试卷)解题思路附.docx
- 2024至2030年双面脚轮项目投资价值分析报告.docx
- [湖南]2024年湖南劳动人事职业学院招聘32人笔试历年参考题库(频考点试卷)解题思路附带答案详解.docx
- [湖南]2024年湖南建筑高级技工学校(湖南建设中等职业学校)招聘17人笔试历年参考题库(频考点试卷.docx
- [烟台]2024年山东烟台市市场监督管理局所属事业单位招聘19人笔试历年参考题库(频考点试卷)解题思.docx
文档评论(0)