- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
物流专业毕业论文写作提纲
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 湖北酒店宽带VPN路由器酒店VPN组网方案.doc
- 湖南中粮可口可乐劳动合同书.doc
- 湖南城市学院毕业设计论文材料格式1.doc
- 湖南省自然科学省市联合基金.doc
- 湖北新油菜籽上市可能会出现抢购现象.doc
- 湖南科技大学毕业论文设计封面.doc
- 湖南城市学院毕业设计论文材料格式.doc
- 湘临天下:一览众菜小.docx
- 湘潭电气 财管.doc
- 湍流模型大涡模拟.docx
- 2025年-2025年一级造价师之建设工程技术与计量(交通)题库附答案(典型题完整版.pdf
- 2025年“安全教育周”活动启动仪式上的讲话稿(四篇) .pdf
- 2025年【全民竞赛网】环保推广试题七 .pdf
- 2025公司员工车辆管理制度7篇 .pdf
- 2025年关于贯彻实施《劳动法》情况的调研报告 .pdf
- 2025年10月乘务员模拟试卷与答案解析29 .pdf
- 2025年-2025年注册消防工程师之消防安全技术实务练习题(一)及答案优质 完整版.pdf
- 2025年-多应用版合同管理办法试行 .pdf
- 2025年《铁路危险货物运输安全监督管理规定》规章解读 .pdf
- 2025危险废物管理制度(真题范文8篇) .pdf
文档评论(0)