- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 湍流模型大涡模拟.docx
- 滇宝女娲家装防水问.doc
- 湘教版高中地理必修三::《流域综合治理与开发》同步练习及答案.doc
- 滨水商业街 精神需求 亲水性 生态论文.doc
- 滨海新区建设对天津市房地产业影响的实证分析.doc
- 演讲稿的写作实用技巧免费下载.doc
- 漫步上海滩上海风情手册.doc
- 澄城县华和国际广场施组.doc
- 潘家园街道鉴.doc
- 漏电保护器的几种错误接线及其后果分.doc
- 上海市浦东新区华东师范大学附属周浦中学2024-2025学年高三下学期3月月考数学试题.pdf
- 天津市宝坻区第四中学2024-2025学年高二下学期第一次质量检测数学试卷.pdf
- 2024企业全面预算管理编制、审批及流程图全套.docx
- 天津市滨海新区北京师范大学天津生态城附属学校2024-2025学年高二下学期3月月考数学试题.pdf
- 基于随机森林的智能电网设备故障诊断与预测研究及成果资料集.docx
- 第二节居住小区的功能布局课件.pptx
- 天津市武清区城关中学2024-2025学年高二下学期3月月考数学试题.pdf
- 云南省红河哈尼族彝族自治州第一中学2024-2025学年高一下学期3月月考数学试题.pdf
- 2024体检中心职业暴露应急预案及处理流程.docx
- 《吉祥纹样》精品教案2023.docx
文档评论(0)