- 1、本文档共54页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 消防灭火应急疏散预案详细版.doc
- 海南房地产报.doc
- 淘淘爱婚庆婚礼庆典主持人用语.doc
- 深圳LED展会策划书.doc
- 深圳申请往来港澳通行证及商务签注.docx
- 深圳电大纳税基础与实务答案.doc
- 深圳地面无线高清数字电视频道表共台.doc
- 混凝土力学数值仿真研究进展 修改.doc
- 清华大学百校庆.doc
- 清凉一下特色冷饮.doc
- 某某单位2024年党建工作总结及2025年工作计划.doc
- 某某市发改委关于2024年度落实党风廉政建设工作责任制情况的报告.doc
- 某某局2024年全面从严治党和党风廉政建设工作总结.doc
- 某某区财政局2024年法治政府建设总结及2025年工作谋划.doc
- 2024年党管武装工作述职报告2篇.doc
- 2024年度国企党委书记抓基层党建工作述职报告3篇.doc
- 公司党委书记2024年述职述廉报告.docx
- 2024年度乡镇党委领导班子民主生活会(四个带头)对照检查材料.doc
- 市医疗保障局关于2024年法治政府建设工作情况的报告.docx
- 市民政局党组2024年巡察整改工作情况报告.docx
文档评论(0)