- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
移动互联网名词解释v
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 省局申报软件操作流程消费税纳税人.doc
- 研发人员的激励.doc
- 皮革品牌的标识.doc
- 破碎站钢结构有限元分析ANSYS.doc
- 研究性学习网络游戏对中学生的影响及对策.doc
- 矿用防爆起动器和防爆磁力起动器价格.docx
- 砼面板坝整理稿.doc
- 石忠路B标技术总结.doc
- 磨炼意志,熔炼团队龙泉.doc
- 硕士科学学位研究生培养计划表.doc
- (高清版)DB42∕T 2128-2023 《中药材 泽泻生产技术规程》.pdf
- (高清版)DB42∕T 2131-2023 《泡桐用材林培育技术规程》.pdf
- (高清版)DB42∕T 2136-2023 《盾构法输水隧道现浇钢筋混凝土二次衬砌技术规程》.pdf
- (高清版)DB42∕T 2140.1-2023 《人事考试考场设置规范 第1部分:笔试》.pdf
- (高清版)DB42∕T 2038.4-2023 《雪茄烟叶生产技术规程 第4部分:农业发酵》.pdf
- (高清版)DB42∕T 2054-2022 《淡水鱼加工机械化前处理技术规范》.pdf
- (高清版)DB42∕T 2282-2024 《湖北省药品监管数据服务管理规范》.pdf
- (高清版)DB42∕T 2199-2024 《粮食烘干中心建设技术规范》.pdf
- (高清版)DB42∕T 2226.3-2024 《自然资源政务一张图应用规范 第3部分:数据共享交换》.pdf
- (高清版)DB42∕T 2228.4-2024 《农副产品加工流通管理规程 第4部分:加工或保藏的水果》.pdf
文档评论(0)