- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 绵阳汽车S店模板.doc
- 绿色食品植物蛋白饮料标准.doc
- 编号第九模块教案.doc
- 综合检索实例国内外数据库.doc
- 罐区重大危险源辨识及危险性分析.doc
- 绿鸽电动车品牌策划案.doc
- 网上种菜偷菜收菜卖菜月赚万元以上doc.doc
- 网上报税最新说明书.doc
- 网站项目策划书实例.doc
- 网站设计方案标准版.doc
- 2023年青海省西宁市城北区小桥大街街道招聘社区工作者真题参考答案详解.docx
- 2023年青海省西宁市城北区小桥大街街道招聘社区工作者真题及参考答案详解1套.docx
- 2025年江西省中考化学真题.pdf
- 医疗人事管理体系创新与实施.pptx
- 2023年青海省西宁市城北区大堡子镇招聘社区工作者真题含答案详解.docx
- 2023年青海省西宁市城北区大堡子镇招聘社区工作者真题及答案详解1套.docx
- 2023年青海省西宁市城北区大堡子镇招聘社区工作者真题带答案详解.docx
- 2025年江西省中考道德与法治真题.pdf
- 2023年青海省西宁市城北区大堡子镇招聘社区工作者真题及参考答案详解一套.docx
- 2023年青海省西宁市城中区饮马街街道招聘社区工作者真题附答案详解.docx
文档评论(0)