- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
自荐书范文[]
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 网站设计方案标准版.doc
- 网上申报开户流程.doc
- 网游校园活动策划方案doc.doc
- 网络基础学习组建小型CS网络.doc
- 网络系统集成单选+多选.doc
- 网络营销与物流配送.doc
- 网络营销与传统营销的比较研究论文[].doc
- 网上申报流程及操作方法.doc
- 网络营销学院项目手册V.doc
- 网上支付系统操作手册修订版.doc
- 中国农业科学院农业资源与农业区划研究所2024年度公开招聘笔试备考题库及答案详解1套.docx
- 中国城市规划设计研究院2025年度公开招聘笔试模拟试题带答案详解.docx
- 2025年银川市公安局面向宁夏警官职业学院招聘285名警务辅助人员笔试模拟试题及完整答案详解1套.docx
- 2025年衢州市公安局第一期招聘54名警务辅助人员笔试模拟试题含答案详解.docx
- 2025年辽宁沈阳理工大学招聘高层次人才142人笔试模拟试题及答案详解1套.docx
- 中国民航科学技术研究院2024年度面向社会公开招聘工作人员笔试模拟试题及答案详解一套.docx
- 中国地质科学院矿产资源研究所2025年度公开招聘工作人员(第一批)笔试模拟试题及参考答案详解一套.docx
- 中国地质科学院地质力学研究所2024年度社会在职人员公开招聘笔试备考题库及答案详解1套.docx
- 中国疾病预防控制中心2024年度公开招聘学校卫生领域学科带头人笔试备考题库参考答案详解.docx
- 中国热带农业科学院南亚热带作物研究所2025年第二批公开招聘工作人员笔试模拟试题及答案详解一套.docx
文档评论(0)