- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
IP网络础知识学习之笑傲江湖新篇
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- CAD快键的用法.doc
- Can总技术定义.doc
- CAD的图快捷键.doc
- CBA科以及休赛期运作的策略.docx
- CBE浐生态区.doc
- Cbozu汽车保险论文关于汽车保险论文:汽车保险精算定价模型研究综述.doc
- CDMA我国发展前景浅析.doc
- ckf高广场D座项目全案策划.doc
- chen给水及采暖监理细则.doc
- COD在监测仪 水质分析仪.doc
- 半导体材料性能提升技术突破与应用案例分析报告.docx
- 半导体设备国产化政策支持下的关键技术突破与应用前景报告.docx
- 剧本杀市场2025年区域扩张策略研究报告.docx
- 剧本杀行业2025人才培训体系构建中的市场需求与供给分析.docx
- 剧本杀行业2025年人才培训行业人才培养模式创新与探索.docx
- 剧本杀行业2025年内容创作人才需求报告.docx
- 剧本杀行业2025年区域市场区域剧本市场消费者满意度与市场竞争力研究报告.docx
- 剧本杀市场2025年区域竞争态势下的区域合作策略分析报告.docx
- 剧本杀行业2025人才培训与行业人才培养模式创新.docx
- 剧本杀行业剧本创作人才心理素质培养报告.docx
文档评论(0)