- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MIK:创逆势强销之“拓客”方略
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- GRE复详细时间表.doc
- GRC构的起源.doc
- EPOQE检索系统中WPI数据库专利编号及文献种类代码.doc
- GPRS线通信在电热网中的应用.doc
- GIA装车技术合同.doc
- GPRS电知识总结.doc
- F发电厂动运煤车电控系统设计.doc
- G终端电邀约营销技巧.docx
- GRR原及计算.doc
- Dynaorm软件的板料冲压成形操作指引.doc
- 中医五音疗法研究进展.pptx
- 远安县2024-2025学年四年级数学第二学期期末检测模拟试题含解析.doc
- 广东省东莞市2025届数学三下期末质量检测模拟试题含解析.doc
- 2025届云南省楚雄彝族自治州民族中学高中毕业生第一次统一复习检测试题生物试题含解析.doc
- 陕西职业技术学院《中外古典园林史》2023-2024学年第一学期期末试卷.doc
- 福建电力职业技术学院《节水农业理论与技术》2023-2024学年第二学期期末试卷.doc
- 2025年会计从业资格证考试题库答案及解析.docx
- 西瓜常见病害及防治.pptx
- 上海中华职业技术学院《Linux系统及应用》2023-2024学年第一学期期末试卷.doc
- 2025届安徽省寿县第一中学第二学期期中七校联考高三英语试题含解析.doc
文档评论(0)