- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- GRR原及计算.doc
- Dynaorm软件的板料冲压成形操作指引.doc
- GYC超类综合布线方案.doc
- HACC在动物养殖过程中应用模式的探讨冯建东珠海出入境检验检疫局.doc
- Haoho讲解几种估价方法共享.doc
- HRM未发展趋势.doc
- HACC计划实施设计.doc
- HACC在搅拌型酸奶中的应用.doc
- H型钢结的应用与发展.doc
- hqol疆昌吉世纪花园住宅小区kg.doc
- 社区老年活动设施设计与老年人认知功能改善研究教学研究课题报告.docx
- 高中数学课堂即时评价对学生学习兴趣激发的研究教学研究课题报告.docx
- 《土地流转政策实施对农业规模化经营中的土地流转市场化程度研究》教学研究课题报告.docx
- 《挥发性有机物(VOCs)排放源排放特征与区域大气污染防控技术热点》教学研究课题报告.docx
- 小学校园水电节能教育课程开发与实施策略研究教学研究课题报告.docx
- 高中历史课程中家国情怀培育的多元路径与实践探究教学研究课题报告.docx
- 初中生校园植物养护实践与生态素养培养研究教学研究课题报告.docx
- 鱼胶产品知识培训课件.pptx
- 阻燃材料在消防应急照明灯具中的应用与性能优化教学研究课题报告.docx
- 初中数学教学中融入校园文化,探究学生空间想象力的培养策略教学研究课题报告.docx
文档评论(0)