- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
plc操箱和防爆防腐操作柱价格
『润联网』
登录【润联网】查询价格
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- IPHDDI高清高速球应用与发展分析.doc
- iphoe开发书籍学习笔记.doc
- IT行业席产品经理高级研修.doc
- IC封装绍,实物拍摄.doc
- IT产品销与实践学习心得.doc
- ISO内检查表.doc
- Java中大作业.doc
- JHA及CL风险评价方法讲解.doc
- KA经理要具备的东东.doc
- KA大卖知识+KA渠道术语释义.doc
- 2025山东威海市乳山南站招聘4人考前自测高频考点模拟试题含答案详解(模拟题).docx
- 2025山东大学新一代半导体材料研究院非事业编制人员招聘1人笔试备考试题含答案详解(实用).docx
- 2025山东临沂蒙阴县教育和体育局引进优秀人才10人考前自测高频考点模拟试题及答案详解(网校专用).docx
- 2025年贸易数据在贸易风险防范中的应用方案.docx
- 2025年家居建材行业消费者需求预测剖析方案.docx
- 政府项目2025年资金申请材料规范及案例分析方案.docx
- 2025年政策导向解读方案绿色金融政策对中小企业影响分析.docx
- 5G通信设备2025年预算预测分析方案.docx
- 产业创新视角下的智慧城市建设方案2025年发展蓝图.docx
- 2025年消费者智能家居产品市场增长动力分析方案.docx
文档评论(0)