- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
sf低噪轴流式通风机和高压防爆风机价格
『润联网』
登录【润联网】查询价格
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- OA办公件常识大全.docx
- NGB关技术及应用.doc
- OA系统能简介.doc
- OHSA标准要素与理解要点.doc
- MBA自介绍的技巧.doc
- Nike标大致有以下几部分组成.docx
- pascl语言中的过程与函数.doc
- O保险系保险学答案.doc
- NIKE装陈列手册.doc
- php数结构算法.doc
- 缺氧诱导因子-1α调控机制对缺氧胃癌细胞侵袭转移的影响及靶向干预策略研究.docx
- 网络浪潮下的坚守与重塑:大学生廉洁教育的创新与实践.docx
- 美国证券内幕交易因果关系证明体系剖析与镜鉴.docx
- 综合电磁法解析乌溪矿区深部成矿机制:理论、实践与创新.docx
- 糖尿病患者胰岛素抵抗程度与甲状腺结节的相关性探究:基于60例样本分析.docx
- 美沙酮维持治疗患者丙肝及艾滋病感染的综合干预策略与成效探究.docx
- 网络浪潮下的思辨与引领:大学生舆情监控与引导探究.docx
- 精准施策:西南交通大学外国语学院大学生弱势群体思政教育路径探究.docx
- 经膀胱2微米激光汽化切除犬前列腺术后尿道再上皮化机制的多维度探究.docx
- 维持性血液透析患者微炎症状态:机制、关联及ACEI类药物的干预探究.docx
文档评论(0)