- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
YG标准运行程序
Q/321181UYG005—2002
Q/321181UYG005—2002
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 18
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled.
您可能关注的文档
- TELEOME常用英文单词及缩写.doc
- S推进策案.doc
- sz图元IS解决方案.doc
- sf低噪轴流式通风机和高压防爆风机价格.docx
- SAP M操作使用说明品保维护检验计划.doc
- TB注塑用户手册.doc
- TJ标水保持措施统计表.doc
- TPM小识三轧厂.doc
- UG应用状及发展前景.doc
- unitd游戏开发之高级界面发送消息与消息的接收.doc
- 2025-2026学年中职专业课-旅游概论-旅游类-旅游大类教学设计合集.docx
- 高中物理个性化学习过程追踪与区块链技术应用研究教学研究课题报告.docx
- 9 艺术教育对青少年审美能力与创造力培养的影响机制及干预策略研究教学研究课题报告.docx
- 《数字孪生与物联网结合的制造业产品远程监控与维护策略》教学研究课题报告.docx
- 基于数字化教学画像的教师职称评审量化指标构建与优化研究教学研究课题报告.docx
- 初中阶段人工智能教育资源均衡调配策略及实时监控效果分析教学研究课题报告.docx
- 《网络文学创作中的地方文化特色与全球视野》教学研究课题报告.docx
- 针对AI教育平台的应急响应机制与安全防护探讨教学研究课题报告.docx
- 小学科学:趣味手工制作材料在科学实验中的创新应用研究教学研究课题报告.docx
- 5G工业互联网助力制造企业实现绿色生产与可持续发展研究教学研究课题报告.docx
文档评论(0)