- 1、本文档共26页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
XX广场户手册
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 24
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- S推进策案.doc
- sz图元IS解决方案.doc
- sf低噪轴流式通风机和高压防爆风机价格.docx
- SAP M操作使用说明品保维护检验计划.doc
- TB注塑用户手册.doc
- TJ标水保持措施统计表.doc
- TPM小识三轧厂.doc
- UG应用状及发展前景.doc
- unitd游戏开发之高级界面发送消息与消息的接收.doc
- UG螺栓维模型零件库的创建.doc
- 汉服文化热浪下电商平台用户增长模式研究.docx
- 2025年在线医疗平台医生职业发展激励机制探究.docx
- 工业机器人协作作业安全培训与应急处理2025年指导手册.docx
- 2025年交通领域碳中和能源替代产业政策解读与建议.docx
- 等效降脂剂量下不同他汀短期应用对急性冠脉综合征炎症因子影响的比较研究.docx
- 2025年乡村民宿旅游产业融合发展报告.docx
- 共享健身仓用户健身进度监测与行为引导方案报告.docx
- 面向2025年的线上职业技能培训平台个性化学习路径规划研究.docx
- 2025年保健食品功能声称与消费者认知调查报告.docx
- 智慧农业无人机数据处理技术:2025年技术创新与产业融合报告.docx
文档评论(0)