- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
X线诊断知识总结归纳
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- unitd游戏开发之高级界面发送消息与消息的接收.doc
- UG螺栓维模型零件库的创建.doc
- TPM的新发展及在全世界的推广和影响.doc
- UG中标件库的建立.doc
- TMF论最新研究成果综述.docx
- UNIX作系统重点知识.doc
- UPS及PS的应用技术与发展趋势.doc
- TFT常英文词汇.doc
- UPS监的重要性及实现方法.doc
- UPS浅未来通信技术发展趋势.doc
- 基于2025年产业扶贫项目的农村社会稳定风险防控与政策创新报告.docx
- 央行数字货币(CBDC)在数字货币支付中的合规与监管挑战.docx
- 后疫情时代,医疗行业药品供应链保障与风险管理策略报告.docx
- 消费金融市场扩张与金融风险防控机制创新策略研究报告.docx
- 人工智能伦理风险预警系统在2025年的法律与伦理分析.docx
- 元宇宙社交平台用户隐私保护法规2025年解读报告.docx
- 2025年跨境电商直播电商基地政策环境与法律法规分析报告.docx
- 后疫情时代医疗行业市场细分领域竞争格局与市场潜力.docx
- 2025年数据要素市场培育策略与实施方案分析报告.docx
- 2025年法律咨询行业线上服务与律师行业数字化转型报告.docx
文档评论(0)