- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 12
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- “团队领者核心才能”评鉴量表之建立.doc
- “增值税程抄报税系统”操作流程.doc
- “十一五我国物流业发展回顾.docx
- “天猫商”计划书.doc
- “形势与策”论文.doc
- “恒康”品营销计划书草案.doc
- “挑战杯大赛和新世纪社会科学创新人才培养总结与回顾,汇报与建议.doc
- “心相印纸巾的上市策划案.doc
- “海底捞背后的故事.doc
- “干股激” 全面.docx
- 2025上海市军队离休退休干部活动中心招聘1人备考试题及答案解析.docx
- 2025年西安经开第十三幼儿园招聘笔试参考题库附答案解析.docx
- 2025年西安经开第十四小学招聘(13人)备考试题及答案解析.docx
- 2025四川德阳市国家综合性消防救援队伍面向社会招录消防员700人备考试题及答案解析.docx
- 2025上海市医药学校招聘1人(第四批)备考试题及答案解析.docx
- 2025年西安思源学院教师招聘笔试参考题库附答案解析.docx
- 2025年上半年黑龙江省农业农村厅事业单位招聘39人笔试参考题库附答案解析.docx
- 2025年上海市文化和旅游局老干部服务中心公开招聘工作人员笔试参考题库附答案解析.docx
- 2025年十堰经济技术开发区公开招聘编外人员14人笔试参考题库附答案解析.docx
- 2025年十堰郧阳区公开招聘社区专职工作人员124人笔试参考题库附答案解析.docx
文档评论(0)