- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《老王》读教学中的互联网搜索教案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 10
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking inst
您可能关注的文档
- 《国际社的主要成员:主权国家和国际组织》 导学案.doc
- 《国际结》案例集锦.doc
- 《变电站合自动化概述》教案.doc
- 《团队凝力训练营》.doc
- 《学术论写作》教学大纲.doc
- 《外汇交理论与实务》.doc
- 《奔跑吧弟》营销与传播策划探究.docx
- 《国际货代理》教学大纲.doc
- 《导游原与实务》.doc
- 《土地估理论与方法》教学大纲.doc
- Unit 5 Days of the week 第1课时 Join in 外研剑桥英语(2024)三年级下册.pptx
- 第五单元第3课时 笔算减法(1)(课件)一年级数学下册(人教版2024).pptx
- Unit 3 Learning Better Part B Read and Write(课件)-三年级英语下学期(人教PEP版2024).pptx
- Unit 4 My Body 复习(课件)新蕾快乐英语一年级下册.pptx
- 1 热爱中国共产党 课件 语文一年级下册统编版2024.pptx
- Unit 6 Lesson 3 How many books(课件)鲁科版(五四学制)(三起)(2024)英语三年级上册.pptx
- Unit4 第3课时Hit it big & Wrap up三年级英语下册(外研版三起2024).pptx
- Unit 5 What time is it Get ready & Start up(课件)外研版(三起)(2024)英语三年级下册.pptx
- Unit 4 What’s your hobby(课件)外研版(三起)(2024)英语三年级下册.pptx
- Unit 1 Lesson 4 My favourite food课件 三年级英语下学期(冀教版2024三起).pptx
文档评论(0)