- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 《奔跑吧弟》营销与传播策划探究.docx
- 《国际货代理》教学大纲.doc
- 《导游原与实务》.doc
- 《土地估理论与方法》教学大纲.doc
- 《外呼式话营销技能实战训练》.doc
- 《广东省然科学基金申请书》.doc
- 《天路》曲欣赏.doc
- 《快乐益园,聪明大挑战》即表内除法一整理和复习教学设计.doc
- 《店长实技能》.doc
- 《微博对们生活方式的影响》.doc
- 家庭服务合同注意事项.docx
- 2025年景德镇市浮梁县小升初数学秋季入学摸底测试卷(含答案).doc
- 2025年景德镇市珠山区小升初数学秋季入学摸底测试卷(含答案).doc
- 2025年晋城市阳城县小升初数学秋季入学摸底测试卷(含答案).doc
- 阅读《日常生活中的思维导图》一能明白的,不需要长篇大论(32页PPT).pptx
- 现代散打教学儿童版课件.pptx
- 2025年晋城市陵川县小升初数学秋季入学摸底测试卷(含答案).doc
- 现代教育技术课件讲解.pptx
- 2025年晋城市高平市小升初数学秋季入学摸底测试卷(含答案).doc
- 2025年晋中市祁县小升初数学秋季入学摸底测试卷(含答案).doc
最近下载
- 诸侯纷争与变法运动【课件】.pptx VIP
- 中国高血压防治指南(2024年修订版)_中国高血压防治指南修订委员会__.pdf VIP
- “扬子石化杯”2024年第38届中国化学奥林匹克(江苏赛区)初赛化学.pdf VIP
- 民事诉讼法中案外第三人对执行的异议之诉.pdf VIP
- 车险承保方案.pdf VIP
- “扬子石化杯”2024年第38届中国化学奥林匹克(江苏赛区)初赛化学试卷含答案.pdf VIP
- 临海市城市生活垃圾焚烧发电厂扩建工程环境影响报告.pdf
- 2025内蒙古鄂尔多斯市公安机关招聘留置看护警务辅助人员115人笔试参考题库附答案解析.docx VIP
- 模电教案-李国丽.doc
- 2023版中国结直肠癌及癌前病变内镜诊治共识PPT课件.pptx VIP
文档评论(0)