- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三叉神经诊治指南
HYPERLINK / /
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by ser
您可能关注的文档
- 【强烈推】出国留学的十个建议.doc
- 《计算机础知识》doc版电子书.doc
- 【李强】传统走向现代.doc
- 【时事政】.doc
- 【凝胶色法的原理和方法】血红蛋白的提取和分离.doc
- 『和桥机微信订阅号整理转载』解码购物中心吸纳式商业空间与环境构建.docx
- 【揭开房产股大涨玄机】.doc
- 【电子书备】细节决定成败读后感.doc
- 【电大】通概论自行整理版【按字母顺序排序】.doc
- 【毕业论】酒店人才流失的原因与对策分析.doc
- 2025新人教英语四年级上册Unit 6 Changing for the seasons Part B 第5课时 Let's learn&Do a survey 课件.ppt
- 2.问题提出(1) 课件 2025西师大版数学二年级上册.ppt
- 3.第1课时 画线段 课件 2025西师大版数学二年级上册.ppt
- 10.1 人类社会的存在和发展 课件 高教版中职思想政治哲学与人生.ppt
- 8.2 明辨是非,追求真理 课件 高教版中职思想政治哲学与人生.ppt
- 2025新人教英语四年级上册Unit 4 Helping in the community Part B 第6课时 Read and write 课件.ppt
- 2.问题提出(2) 课件 2025西师大版数学二年级上册.ppt
- 2025新人教英语四年级上册Unit 6 Changing for the seasons Part A 第3课时 Let's spell 课件.ppt
- 8.1 透过现象认识本质 课件 高教版中职思想政治哲学与人生.ppt
- 第2课时 年、月、日知多少 课件 2025西师大版数学二年级上册.ppt
文档评论(0)