- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
上消化道血病人的护理
正 文
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 4
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts
您可能关注的文档
- 一级注册筑师复习资料整理.doc
- 一级建造教材修改.doc
- 万泉小学届魅力教师玉兰奖颁奖活动策划方案.doc
- 万景书香舍技术标书.doc
- 万科房地掼蛋大赛策划案.doc
- 七格格竞分析.doc
- 万科金域府给排水监理细则.doc
- 万能品质册上.doc
- 万豪商业营销策划方案.doc
- 三下乡活总结.doc
- 高中物理教学中人工智能辅助下的学习分析结果可视化研究教学研究课题报告.docx
- 校园书店阅读氛围对初中生阅读习惯塑造的影响机制研究教学研究课题报告.docx
- 5 《湿地生态系统服务功能与区域生态环境治理的协同效应研究》教学研究课题报告.docx
- 小学数学解决问题能力培养策略探讨教学研究课题报告.docx
- 《茶叶种植新型肥料对茶园土壤微生物多样性影响的研究》教学研究课题报告.docx
- 初中数学教学中的数学实验活动设计与学生应用能力培养研究教学研究课题报告.docx
- 汽车涂装尼龙配件项目可行性研究报告建议书.doc
- 植物工厂智能化环境控制对叶菜类植物生长与品质的同步调控研究教学研究课题报告.docx
- 《学前教育中幼儿音乐素养启蒙教育的音乐教育游戏化实践与反思》教学研究课题报告.docx
- 高中政治课堂辩论法运用:辨析式教学策略对学生思辨能力的提升研究教学研究课题报告.docx
文档评论(0)