- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 世界各国防介绍.doc
- 世界五大具派系PK中国四大刀具之都.doc
- 世界各国车大全已经更新.doc
- 世界各国车车标大全附其由来.doc
- 世界各国车标志大全附由来.doc
- 世界各大车标志.docx
- 世格外贸证教学系统.doc
- 世界各大外品牌性能评说.doc
- 世界名校你不知道的东京大学.doc
- 世界核能展状况.doc
- 开源证券-传媒行业周报:沿景气趋势,坚定布局游戏、线下文体娱、AI应用行业周报.pdf
- 华福证券-电子行业定期报告:AIoT行业生态加速完善,端侧AI硬件部署全面发展.pdf
- 远望谷-002161-远望谷:中报预喜扣非扭亏,加码AI投入,“智慧文旅”、“宠物经济”或成业绩看点.pdf
- 浙商证券-资产、风格、行业与黄金深度复盘-谁战胜了“金本位“.pdf
- 华金证券-电子行业周报:GPU企业加速上市进程,国产算力有望迎来加速发展.pdf
- 东证期货-新能源汽车周度报告:上半年新能源汽车延续高增长.pdf
- 开源证券-基础化工行业周报:国内反内卷持续发酵,海外多家化工企业产能关停.pdf
- 天风证券-招商港口-001872-布局新兴市场,量价有望上行.pdf
- 信达证券-信用利差周度跟踪:债市调整中信用相对强势 1Y期收益率逆势下行.pdf
- 信达证券-航空运输月度专题:客座率高位持续,看好暑运旺季票价回升.pdf
最近下载
- 八项规定回头看自查报告.pdf VIP
- 2012北京 第一册市政道路、桥梁工程预算定额.pdf VIP
- 华为LTC流程IPD流程ITR流程三大核心流程变革一篇文章就全明白啦V2.0!.pdf VIP
- 普洱哈尼族彝族自治县2025年数学五年级第二学期期末学业质量监测试题含答案.doc VIP
- D-ZD2010发电厂汽水管道支吊架设计手册制造图册-中国电力规划.pdf VIP
- 产科急救应急预案.docx VIP
- 关于社区卫生服务中心五年发展规划十五五发展规划2025.docx VIP
- NBT 25085-2018 核电厂常规岛焊接技术规程.pdf VIP
- 烟草代办合同范本6篇.docx VIP
- 危险废物污染防治责任制度.docx VIP
文档评论(0)