- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国的发和亚洲的未来
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 8
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marki
您可能关注的文档
- 中国·沈首届东北亚动漫游戏展方案.doc
- 中南财经法大学.doc
- 中国仓储会简介.doc
- 中国人身险从业人员资格项目介绍.doc
- 中国二级科分类与代码国家标准.doc
- 中国人民产保险 机动车保险条款.doc
- 中国传统学的特质与优良传统.doc
- 中国保险业发展情况.doc
- 中国保险品牌建设.doc
- 中国传统化选讲教案.doc
- 2025国企作风建设党课讲稿:锲而不舍落实作风建设精神,以作风建设新成效开创集团公司高质量发展新局面.docx
- 2025作风建设学习教育专题进展汇报:强化作风建设,提升机构编制工作效能.docx
- 《艺术导论》艺术专业理论基础课程全套教学课件.pptx
- 《电工知识与技能(初级) 》技工全套教学课件.pptx
- 《电机与电气控制(第二版)》技工全套教学课件.pptx
- 2025党委班子学习教育专题“回头看”自查报告.docx
- 2025年中学学校关于深入贯彻作风建设学习教育专题“回头看”情况报告.docx
- 《印后加工工艺》技工全套教学课件.pptx
- 清洁验证中不同阶段清洁验证的重点培训课件.pptx
- 化验员基础技能实操考核要求培训.pptx
文档评论(0)