- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中英文个简历模板和常用词汇
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中国物流展的现状.doc
- 中国海洋学srdp网购的营销策略分析吴毅.doc
- 中国特色会主义期末总结超全.doc
- 中国滤泡淋巴瘤诊断与治疗指南.doc
- 中国电力版社广州发行站.doc
- 中国煤炭具竞争力品牌排行榜.doc
- 中国特色会主义理论与实践研究复习提要.doc
- 中国沿海装箱船运输分析与预测.doc
- 中国电力统电压等级与变电站种类.doc
- 中国电子务大联盟介绍资料.doc
- Global_Decentralized_Payment_and_Clearing_Network_Construction_Plantruction_Plantruction_Plan参考资料说明.pdf
- Belt and Road Supply Chain Finance Blockchain Solution参考资料说明.pdf
- 附件6、征求意见稿_四甲基氢氧化铵五水合物.pdf
- 附件4.征求意见稿-基于干法工艺锂离子电池用铝塑复合膜.pdf
- 易错06 特殊四边形的性质与判定(七大易错分析+举一反三+易错题通关)(原卷版).pdf
- 易错06 特殊四边形的性质与判定(七大易错分析+举一反三+易错题通关)(解析版).pdf
- 竞选生活委员发言稿(合集15篇).doc
- 社区重阳节讲话稿.doc
- 订婚父母讲话稿.doc
- 纪律委员竞选的演讲稿(范文15篇).doc
文档评论(0)