- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
久咳嗽不的药方
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中国离世有多远.docx
- 中国联通村虚拟网推广策略及创意简报.doc
- 中国空间术研究院.doc
- 中国的世遗产.doc
- 中国联通营销策略分析.doc
- 中国肝癌疗指南.doc
- 中国网络体的未来.doc
- 中国竹资分布及产业发展现状.doc
- 中国肾癌疗指南内科治疗解读.doc
- 中国肿瘤状调查.docx
- DB22_T2503-2016_村级基础设施建设及维护管理规范_吉林省.pdf
- DB22_T2478-2016_人参中人参总皂苷的测定重量法_吉林省.pdf
- DB22_T2552-2016_盆花香雪兰设施生产技术规程_吉林省.pdf
- DB22_T2465-2016_水中三唑锡、苯丁锡残留量的测定液相色谱-电感耦合等离子体质谱法_吉林省.pdf
- DB22_T2482-2016_延边黄牛饲料质量控制规范_吉林省.pdf
- DB22_T2496-2016_消防救援人员现场管理系统技术要求_吉林省.pdf
- DB22_T2540-2016_泥炭与土壤调理剂植物响应测定方法_吉林省.pdf
- DB22_T2442-2016_地理标志产品黑水西瓜_吉林省.pdf
- DB22_T2470-2016_二维动画生产工艺流程_吉林省.pdf
- 2025至2030年中国裂隙灯显微镜市场现状分析及前景预测报告.docx
文档评论(0)