- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
产品与渠案例分析
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 九江学院文样本.doc
- 乐美自动货超市项目计划书.doc
- 九级思想治第一单元.doc
- 义乌国际流中心.doc
- 乐器垃圾监控LED屏空调电脑.doc
- 乡村华联低物流成本的方法.doc
- 乡村基的WOT分析.doc
- 九龙站先号申报材料.doc
- 书店辅助书系统论文.doc
- 乐视CE贾跃亭的疯子计划.doc
- 2025年一级建造师考试《水利水电工程管理与实务》冲刺必刷卷.docx
- 2025年一级建造师考试《水利水电工程管理与实务》逆袭破题卷1.docx
- 2025年一级建造师考试《市政工程管理与实务》冲刺必刷卷 .docx
- 2025年一级造价工程师考试《建设工程计价》预习卷.docx
- 2025年一级造价工程师考试《建设工程造价管理》预习卷.docx
- 2025年一级造价工程师考试《建设工程造价案例分析(安装专业)》预习卷.docx
- 2025年一级造价工程师考试《建设工程造价案例分析(土建专业)》预习卷.docx
- 2025年中级会计考试《会计实务》冲刺提分卷.docx
- 2025年中级会计考试《财务管理》冲刺提分卷.docx
- 2025年中级会计考试《财务管理》全真模拟卷.docx
最近下载
- 中国共产主义青年团团章.doc VIP
- 照明工程数量表计算.xlsx VIP
- 2024汽车维修工时定额.docx VIP
- 内网及邮箱用户名列表.doc VIP
- 新解读《GB_T 18295 - 2001油气储层砂岩样品扫描电子显微镜分析方法》最新解读.docx VIP
- DB11T 945.1-2023建设工程施工现场安全防护、场容卫生及消防保卫标准 第1部分:通则.pdf VIP
- JGT 160-2017 混凝土用机械锚栓.docx VIP
- 建筑施工安全生产治本攻坚三年行动方案(2024-2026年).docx VIP
- 2024年内蒙古巴林左旗林业和草原局国有公益林护林员招聘真题.docx VIP
- 鲁教版(五四学制)六年级上册地理期末复习重点知识点提纲(实用!).docx VIP
文档评论(0)