- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人与自然谐共生
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 4
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking insta
您可能关注的文档
- 二十七层合楼的建筑给排水设计案例毕业设计.doc
- 乳品行业费者消费行为及心理研究.doc
- 二十六种口品牌牛奶大起底喝奶的你不能不看.doc
- 二级学科类与代码表.doc
- 二级学院学秘书岗位分析实施方案.doc
- 二十道材作文.doc
- 二级建造教材下载.doc
- 二维码在O电子商务模式中的应用.doc
- 二调地类类表.doc
- 二轮复习言文翻译教师.doc
- 中国行业标准 DB/T 100-2024区域性地震安全性评价.pdf
- 《GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架》.pdf
- GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- DB/T 100-2024区域性地震安全性评价.pdf
- 中国行业标准 GM/T 0138-2024C-V2X车联网证书策略与认证业务声明框架.pdf
- 校园周边书店阅读氛围对初中生阅读素养提升的影响研究教学研究课题报告.docx
- 初中校园餐饮卫生监管与食品安全教育创新模式研究教学研究课题报告.docx
- 《文化遗产保护与旅游开发平衡机制的法律法规完善研究》教学研究课题报告.docx
- 《农作物病虫害生物防治技术的经济效益与社会影响分析》教学研究课题报告.docx
- 1 剖宫产术后子宫瘢痕憩室治疗中的并发症预防与护理措施教学研究课题报告.docx
文档评论(0)