- 1、本文档共17页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
仓储与自分拣实训指导书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 16
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 亚伯拉罕行销策略.doc
- 亚洲供应对全球再平衡具有重要意义.doc
- 交互式电白板多媒体教室示意图.doc
- 亚太博宇经顾问.doc
- 互联网行办公自动化OA软件案例及分析.doc
- 交强险的定免责事由.doc
- 交换机和康和.doc
- 五星级酒数字无线对讲系统.doc
- 交易中心费指南.doc
- 交替传译口译词汇之艾滋病词汇.doc
- 【2025教育教学论文一等奖】三式结构化:新课标下小学语文整本书阅读进阶式策略探析.docx
- DB37_T 5189-2021 机械式停车库技术规程.docx
- DB42_T 2380-2025 养老机构失智老年人生活自理能力训练.docx
- DB43_T 3213-2025 残疾人友好医院建设指南.docx
- DB42_T 2393-2025 矿产资源管理数据资源目录编制规范.docx
- DB11_T 2435-2025 清洁鸡蛋生产质量安全控制技术规范.docx
- DB43_T 3211-2025 残疾人友好企业建设指南.docx
- DB43_T 3214-2025 有机固废椰丝植生毯应用技术规程.docx
- DB43_T 3212-2025 残疾人友好社区建设指南.docx
- DB13_T 6123-2025 12309检察服务中心服务规范.docx
文档评论(0)