- 1、本文档共24页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
信用证案分析,含答案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 24
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 作文连锁构汇总.doc
- 住宅小区能化系统建议书通用.doc
- 作业 合品牌.doc
- 何双荣 谈成长型家庭教育对孩子发展的重要性.doc
- 作业三答.doc
- 作特训作之 “追”写作指导和范文展示.doc
- 你了解多装修方面的知识.doc
- 佳洁士闪炫白牙膏.doc
- 佳源中心场情况.doc
- 你那便利业绩提升方案案例分析.doc
- 2025年四川省广安市中考数学试卷含答案解析.docx
- 全球视野下个人所得税法的比较研究与中国借鉴路径探索.docx
- 全球视野下专利申请制度的协同演进与发展.docx
- 全球视野下消费税制的比较与启示:基于国际经验的深度剖析.docx
- 全球视野下的人才遴选与责任担当:联合国国际公务员考录制度剖析.docx
- 2024年全国一级建造师之一建通信与广电工程实务考试仿真模拟题(详细参考解析)- 建造师考试复习策略.pdf
- 全球金融视角下世界黄金期货价格联动性剖析与策略研究.docx
- 全球视野下购物免税与退税政策的多维比较与启示.docx
- 全聚合物共混体系:相分离机理洞察与形貌精准调控策略探究.docx
- 全脊椎整块切除重建术:脊柱肿瘤治疗与脊柱稳定性重建的深度剖析.docx
文档评论(0)