- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
关于个人国际法上的地位如何
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 公共关系习范围.doc
- 公共关系平时作业.doc
- 公共交通展政策保障体系设计.doc
- 全直达人手册.doc
- 公共关系社交礼仪复习资料.doc
- 公共关系第二次作业.docx
- 公共关系 网上作业.docx
- 公共关系社交礼仪的结业论文.doc
- 公交行政可项目及实施程序.doc
- 公共关系科案例.doc
- 《电动汽车电池制造工艺中电池制造工艺设备操作技能培训与质量控制研究》教学研究课题报告.docx
- 游戏化人工智能教育资源在小学科学探究活动中的教学策略研究教学研究课题报告.docx
- 节能热水系统生产线项目初步设计.docx
- 基于深度学习的图像超分辨率重建在视频处理中的应用研究教学研究课题报告.docx
- 《航空运输服务质量评价指标体系构建与提升策略研究——以航空培训服务为切入点》教学研究课题报告.docx
- 节能热水系统生产线项目规划设计方案(参考范文).docx
- 初中数字化课外活动课程体系建设研究:促进学生数字素养发展的策略教学研究课题报告.docx
- 2023年甘肃省陇南市文县口头坝乡招聘社区工作者真题带答案详解.docx
- 小学科学个性化教学策略优化:强化学习在实验操作中的应用教学研究课题报告.docx
- 小学语文课堂生成式AI互动反馈的应用策略分析教学研究课题报告.docx
文档评论(0)