- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
化妆品专店未来的四种营销模式
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 别让绩效为鸡肋.doc
- 到月时事治汇总.doc
- 前列腺炎治指南.doc
- 前列腺囊的诊治指南.doc
- 前厅部一服务案例的启示.doc
- 前列腺癌断治疗指南.doc
- 前列腺癌治指南.doc
- 前处理电环保浅析.doc
- 别克汽车销策划文案.doc
- 剪力墙内留给水支管.doc
- 2025至2030中国公立医院行业市场深度研究与战略咨询分析报告.docx
- 2025至2030蒸发器盘管行业产业运行态势及投资规划深度研究报告.docx
- 2025至2030植物纤维行业产业运行态势及投资规划深度研究报告.docx
- 2025至2030中国N,N,N',N'四甲基乙二胺行业发展趋势分析与未来投资战略咨询研究报告.docx
- 2025至2030中国水下定位信标(ULB)行业发展趋势分析与未来投资战略咨询研究报告.docx
- 2025至2030中国乙烯基酯树脂行业项目调研及市场前景预测评估报告.docx
- 2025至2030中国双座自行车行业项目调研及市场前景预测评估报告.docx
- 2025至2030中国社区居家养老行业产业运行态势及投资规划深度研究报告.docx
- 2025至2030注射穿刺器械行业项目调研及市场前景预测评估报告.docx
- 2025至2030中国儿童主题乐园行业产业运行态势及投资规划深度研究报告.docx
文档评论(0)