- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
咳嗽中医疗方案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 可持续城污水处理系统及其在中国的应用.doc
- 古玩城策方案.doc
- 可编程逻知识体系总结.doc
- 可再生能建筑应用示范项目测评导则.doc
- 变电站综智能视频监控技术方案.doc
- 可靠性设思路与实务.doc
- 可怜天下母心.doc
- 台湾自行消费者购买决策过程之分析.doc
- 可编程逻器件的发展与应用.doc
- 可伸缩带输送机毕业设计.doc
- 301115_2024_#ESG_联检科技_2024年度环境、社会和治理(ESG)报告_2025-04-29.pdf
- 300308_2024_#ESG_中际旭创_2024年环境、社会及公司治理(ESG)报告_2025-04-21.pdf
- 想生科技产品注册公告及所需文件상생기술제품_등록_공고문_및_제출_서류.pdf
- 300760_2024_#SD_迈瑞医疗_2024年度可持续发展报告_2025-04-29.pdf
- 300870_2024_#SD_欧陆通_欧陆通2024年可持续发展报告_2025-04-22.pdf
- 301369_2024_#ESG_联动科技_2024年度环境、社会与公司治理(ESG)报告_2025-04-18.pdf
- 300937_2024_#SD_药易购_2024年度可持续发展报告_2025-04-25.pdf
- 300621_2024_#ESG_维业股份_维业股份:2024年度环境、社会和公司治理(ESG)报告_2025-04-19.pdf
- 300428_2024_#SD_立中集团_立中四通轻合金集团股份有限公司2024年度可持续发展报告-中文版_2025-04-21.pdf
- 301167_2024_#ESG_建研设计_2024年度环境、社会及公司治理(ESG)报告_2025-04-04.pdf
最近下载
- 心理健康教育主题班会教学设计.docx VIP
- 计算机类本科毕业论文-综合考试系统的设计与实现.docx VIP
- SAE_J1939-73(故障诊断)协议.pdf VIP
- SN/T 1246-2012_入出境黄热病染疫船舶卫生处理规程.pdf VIP
- 人教版2024四年级上册英语Unit1 A 第2课时 课件.pptx VIP
- 新22J01《工程做法》(新疆图集).pdf VIP
- 中国古代文学2教案(魏晋南北朝隋唐五代文学)详解.doc.docx VIP
- 2025现代汉语语法 句子成分 讲解+练习课件.pdf
- TCAMET01008-2023 地铁区间疏散平台设计规范.pdf VIP
- 水电集团有限公司章程-法律意见书.doc VIP
文档评论(0)