- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
广西科学究与技术开发计划项目执行情况调查代码手册
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking instal
您可能关注的文档
- 山西大学胞生物学实验论文.doc
- 山东省锅大气污染物排放标准.doc
- 山西医科学博士研究生海外培养计划审批表.doc
- 山姆·月明珠土建实施细则.doc
- 山西省自科学基金.doc
- 山西省科成果转化与推广计划.doc
- 岗位廉政险防范承诺书.doc
- 岗位能力员评价表.doc
- 山茶油的费者分析.doc
- 岗位分析明书.doc
- DB3311_T 281-2024 山区乡镇卫生院急救站设置和运行规范 .docx
- DB3311_T 283-2024 雷竹笋早出丰产栽培技术规程 .docx
- DB3311_T 285-2024 基于项目的碳减排量核算指南 竹材料替代.docx
- DB3311_T 290-2024 芥菜栽培技术规程 .docx
- DB3311/T 145─2020农村土地承包经营权流转工作规范.docx
- DB3311/T 150─2020家政服务机构运营管理规范.docx
- DB3311/T 217─2022绿道养护技术规范.docx
- DB33T 1395-2024产品碳足迹评价 纺织和服装类.docx
- DB33T 2016-2016 乡村气象防灾减灾建设规范.docx
- DB33T 2114.2-2022综合交通视频交换技术规范 第2部分:视频交换协议.docx
文档评论(0)