- 1、本文档共12页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
清开灵注液不良反应的分析
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 深 圳 广 告 协 会.doc
- 深圳DUT气体检测仪多少钱 煤粉检测仪如何安装 煤粉检测仪安装多高 煤粉检测仪如何标定.docx
- 深圳万豪业城策划案.doc
- 深圳东方玩城策划方案.doc
- 深圳城市象标志方案说明.doc
- 深圳市技攻关项目申请指南.doc
- 深入调查后,感觉上海交通大学是个天堂一般的地方~.doc
- 深圳新材产业现状及政策建议.doc
- 深圳高新介绍.doc
- 深油所前油招商优势.doc
- 直播带货在零售行业中的应用挑战与规范化管理策略报告.docx
- 河道修防与防冶工《工程观测、养护考点巩固》模拟卷_1.doc
- 水库扩建工程工程建设方案(范文模板).docx
- 2025至2030中国汽车电子压缩机行业市场现状分析及竞争格局与投资发展报告.docx
- 铜冶炼生产线项目质量管理方案(参考).docx
- 元宇宙社交平台隐私保护案例2025:隐私保护与数据利用的伦理考量.docx
- 2025年联合利华多品牌策略对产品创新推动力报告.docx
- 社区志愿服务数字化管理平台在社区邻里互助中的作用报告.docx
- 2025年跨境电商直播电商基地供应链优化与创新策略报告.docx
- 针对2025年中小学STEAM教育推广的跨学科课程资源整合与利用研究报告.docx
文档评论(0)