- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
病理学作答案
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 电脑键盘用大全.doc
- 电视栏目传统文化的对接.doc
- 电子警察决方案.doc
- 电脑中的CB元件.doc
- 电话案发重审裁定.doc
- 电气防火爆技术.doc
- 电话营销信营销话术.doc
- 电镀处理重金属废水处理方法比较.doc
- 电镀废水理与回用技术说明.doc
- 电话营销业论文.doc
- 2025年河南省人民防空办公室下属事业单位招聘考试笔试试题(含答案) (2).docx
- 中卫市市级机关选调真题2024 .pdf
- 初中历史新人教版八年级上册全册知识点简答题练习(分单元编排,附参考答案)(2025秋).docx
- 兴城市市级机关选调真题2024 .pdf
- Unit 2 Amaing numbers 课时3 Section 2 Grammar(分层作业) .pdf
- 2026届泰州中学江苏省泰州中学、如东高级中学、靖江高级中学、宜兴中学 英语高三上期末复习检测试题含解析.doc
- 2026届浙江省嘉兴市重点名校高三英语第一学期期末复习检测试题含解析.doc
- 云南省玉溪市红塔区普通高中2026届高三英语第一学期期末经典模拟试题含解析.doc
- 辽宁省大连市普兰店区第一中学2026届高三语文第一学期期末考试试题含解析.doc
- 2026届中山纪念中学高三英语第一学期期末考试模拟试题含解析.doc
文档评论(0)