- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
百汇嘉业媒总策划张铭峰另类解读影视作品与商战:《满城尽带黄金甲》与营销
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 画法几何CAD教学大纲.doc
- 男式内耳皮鞋贴楦设计.doc
- 留学文书作材料.docx
- 畜牧业为的农业地域类型教学设计.doc
- 男性不育病诊治指南.doc
- 畜禽新品配套系审定和畜禽遗传资源鉴定.doc
- 病案导入教学法在病理学教学中的应用.doc
- 病理学之癌相关知识点.doc
- 病理学与理生理学教学大纲.doc
- 电子行业用词汇.doc
- 天他这给出详解.pdf
- 详解海豚综合39granier b p 65 flip805x.pdf
- 电子国防杂志两个名选择fulltxt 1.pdf
- 主管中药师基础知识练习jczs lx2141.pdf
- 课件教程成果apsg world history1.pdf
- 欢迎来到自动化构建器精简版readme.pdf
- 人教版英语九年级Unit 3 Could you please tell me where the restrooms are?词汇句型语法强化训练含答案.docx
- 人教版英语九年级Unit 10 You are supposed to shake hands词汇句型语法强化训练含答案.docx
- 新意互动马自达全新品牌传播越己心力量篇.pdf
- 一阶段基础课堂笔记day14.pdf
最近下载
- 水泥厂电气培训课件.pptx
- 体例格式9:工学一体化课程《windows服务器基础配置与局域网组建》任务1学习任务工作页.docx VIP
- 金税四期税务风险预警指标汇总.pdf
- 豆腐柴人工栽培技术.pdf VIP
- 天津市小升初小卷真题小外(天津市外国语大学附属外国语学校)(5套含答 .pdf VIP
- 控制计划(机加).docx VIP
- 土地资源管理学(第二版)张正峰,第一至第十二章知识点.docx VIP
- 专题三 透镜及其应用 2025年中考物理基础知识考点专题练习(含答案).docx VIP
- DL/T 502-2006 火力发电厂水汽分析方法(第1-32部分).pdf VIP
- 施工现场总平面布置培训.pptx VIP
文档评论(0)